PECCI MUSEUM | PRATO

The construction of the structural shell for the new Pecci Museum in Prato, created from the enlargement of the old centre and redesigned by the architect Maurice Nio as a new icon for the city and a point of reference for contemporary art.

See details...

 

ARCHED BRIDGE | VIGEVANO

A construction weighing 510 tons in steel for the structural components used in the new arched bridge in Vigevano. Design and installation was carried out by the customer.

See details...

 

ADVERTISING TOWER | VERONA

The construction of a scenic tower for an imposing advertising sign in San Bonifacio in Verona. The advertising tower with its 33 metres in height, stands out showing its presence along the Verona stretch of the A4 motorway.
The amount of processed material was 15 tons of carbon steel.

See details...

 
 
 

LIFTING STRUCTURE | POLAND

2000 tons of lifting capacity were achieved thanks to the use of Metalsan processes for the construction of a hinged element for special lifting intended for Northern Europe.

See details...