GASHOLDER BALCONY | LONDON
The construction of 57 balconies / terraces for Gasholders London (United Kingdom)
Amount of processed material: 120 Tons approx.
The construction of 57 balconies / terraces for Gasholders London (United Kingdom)
Amount of processed material: 120 Tons approx.
The construction of the structural shell for the new Pecci Museum in Prato, created from the enlargement of the old centre and redesigned by the architect Maurice Nio as a new icon for the city and a point of reference for contemporary art.
A construction weighing 510 tons in steel for the structural components used in the new arched bridge in Vigevano. Design and installation was carried out by the customer.
The construction of a scenic tower for an imposing advertising sign in San Bonifacio in Verona. The advertising tower with its 33 metres in height, stands out showing its presence along the Verona stretch of the A4 motorway.
The amount of processed material was 15 tons of carbon steel.
Metalsan constructed the impressive structure used for positioning the containment gates in water for the MOSE project
Construction of lower weirs for the SS9 bridge on the River Po (Piacenza).
Quantity of processed material: 700 Tons approx.
2000 tons of lifting capacity were achieved thanks to the use of Metalsan processes for the construction of a hinged element for special lifting intended for Northern Europe.
Metalsan produced 16 complete industrial mobile cranes using structural steel and low-alloy high yield steels.
Metal constructions for buildings, roofing, conference and meeting rooms for the Exhibition centre in Milan
Quantity of material processed: 700 Tons approx.