ARCHED BRIDGE | VIGEVANO
A construction weighing 510 tons in steel for the structural components used in the new arched bridge in Vigevano. Design and installation was carried out by the customer.
A construction weighing 510 tons in steel for the structural components used in the new arched bridge in Vigevano. Design and installation was carried out by the customer.
Metalsan was involved in the construction weighing 310 tons for the new Stramentizzo bridge, in the province of Trento.
The new scenic bridge in Pescara involved our skilled workforce who carried out the perfect production.
As part of the project for the Pedemontana Veneta motorway our company was involved in the construction of the Astico viaduct with a structure weighing 430 tons.
The challenging project for the bridge over the River Po in the province of Piacenza involved Metalsan with a structure weighing 700 tons of steel.
Construction of lower weirs for the SS9 bridge on the River Po (Piacenza).
Quantity of processed material: 700 Tons approx.
Our company constructed 510 tons of carbon steel to bypass the river Ufente in the province of Latina.
The construction of a structure designed to serve as a drawbridge made mainly in carbon steel.
The construction of welded structures for a viaduct, weighing a total of 350 tons in carbon steel. The parts were painted inside the factory and transported to the site using special oversize load transport means.
Metalsan was part of the IRICAV consortium for the construction of the asse median in Naples using 1000 tons of structural steel.