Work carried out

The Pedemontana Veneta reorganized the flow of traffic in the northern part of the region and was the largest road project ever to be carried out in the area.

Metalsan was involved in the construction of the second lot for the Astico viaduct, producing the structure in a short time span, loading the 430 tons processed onto the special oversize load vehicles involved.

Project Gallery