Work carried out

Construction of lower weirs for the SS9 bridge on the River Po (Piacenza).
Quantity of processed material: 700 Tons approx.

“Dimensions and numbers are certainly parameters that define a “great work”, but in the case of the new bridge on the River Po in Piacenza other aspects such as the design, the close connection between concept and creation have enabled the reconstruction of an infrastructure which, by achieving several records for formal and structural innovations with the highest respect for costs and production times, can be considered “great” in the broadest sense of the word.”

cit. Promozione Acciaio – SS9 bridge on the River Po: the bridge of records